PBG document

The Purpose of Building Approval (PBG) as a Replacement for IMB

The government has officially implemented a new regulation replacing the Building Permit (IMB), namely the Building Approval (PBG). So, what is the purpose of Building Approval? Is its purpose not much different from IMB? And how can you obtain it?

To answer all these questions, let’s go through the explanation below.

Purpose of Building Approval (PBG)

Regarding its ownership, you can find 3 main purposes of Building Approval, namely:

1. Legal Assurance of the Building

The first purpose of PBG is to provide legal assurance. Having a PBG proves that a building is legally constructed and complies with Indonesian law. Moreover, in the process of obtaining it, you must go through every requirement and procedure stipulated by the government.

2. Assurance of Compliance with Safety, Comfort, and Health Standards

Next, the purpose of Building Approval is to ensure that the building’s quality complies with standards. So, if a building already has a PBG, it means the building meets safety, comfort, and health standards.

It’s important to know that the PBG process involves aspects of building planning and design. Additionally, PBG requires building owners to supervise the construction and building functions.

Therefore, when processing PBG, professionals are often involved to facilitate approval. For example, you may involve an architect in the building design process.

3. Proof of Legal Compliance

The final purpose of Building Approval is as proof of a citizen’s compliance with Indonesian law. PBG also proves that you do not construct a building carelessly. Instead, the construction complies with spatial planning regulations.

Moreover, PBG ensures that building construction and utilization do not cause environmental damage. During the application process, an inspection is conducted related to environmental aspects, including drainage, waste management, and the like.

How to Obtain a PBG

Source : Envato

With such important purposes, every building owner—especially for business purposes—needs to have a PBG. So, how do you obtain it?

There are several key steps you need to take to obtain a PBG, namely:

1. Prepare PBG Application Requirements

Several documents need to be prepared when applying for a PBG, including:

  • Proof of land ownership;
  • Building design drawings;
  • Building structure calculations;
  • Recommendation letter from the relevant agency (optional as needed);
  • Environmental Impact Analysis (AMDAL) document for large-scale buildings, at least 10,000 square meters and located on land of at least 5 hectares.

2. Prepare Technical Documents

Once the required documents are ready, the next step is to prepare the technical documents. These include various files such as structural planning, architectural drawings, mechanical-electrical designs, and others. You can entrust these documents to professionals such as structural engineers or architects.

3. Submit the Application

Once the technical documents are ready, you can submit the application online. The submission is addressed to the local government.

4. Verification and Evaluation

Once the application is submitted and accepted by the local government, a team will conduct verification and evaluation. Various aspects will be checked, such as compliance between the documents and technical standards, zoning regulations, and spatial planning.

5. Issuance of PBG

If the verification process goes smoothly, the local government will issue the PBG. Then, you can start construction activities according to the initial plan.

That’s the information about the purpose of Building Approval and how to apply for it. Not too difficult, right? However, the process can take quite some time, especially if you’re busy managing your company’s business operations.

The good news is, there’s an effective solution from Elmar you can take advantage of. Elmar is ready to assist you in handling various permits related to starting a business in Indonesia. This way, your company’s business activities won’t be disrupted by the permitting process you need to go through.

Practical and reliable!

The Purpose of Building Approval (PBG) as a Replacement for IMB Read More »

Latest PBG Regulation as a Replacement for IMB, Know the Difference!

Did you know that the regulations regarding Building Permits (IMB) have changed? Instead, you need to be familiar with the latest PBG regulation or Building Approval. Please note, the regulation regarding PBG has been in place since 2020 following the enactment of the Job Creation Law.

Understanding PBG is especially important for business owners. This is even more relevant for those looking to expand their business or investors intending to invest in the country. So, what are the differences between PBG and IMB? To make it clear, let’s go through the explanation below!

Legal Basis for the Latest PBG Regulation

Source : Envato

The main legal basis for PBG in Indonesia is Article 24 and Article 185 letter B of Law No. 11 of 2020 on Job Creation. Furthermore, the government issued a follow-up regulation through Government Regulation No. 16 of 2021 on the Implementation of Law No. 28 of 2002 on Buildings.

Under this regulation, PBG functions to replace the previously applicable IMB. PBG serves as permission granted to building owners to construct new buildings, modify, expand, maintain, or reduce buildings in accordance with building technical standards.

What kind of technical standards are related to PBG? These technical standards cover building planning and design. Additionally, they are related to construction implementation, construction supervision, and the utilization of the building.

Differences Between IMB and the Latest PBG Regulation

Source : Envato

With the issuance of the new PBG regulation, you may wonder, what’s the difference from IMB? There are several key differences between these two types of permits:

1. Scope

The first aspect differentiating PBG from IMB is their scope. IMB has a limited scope applicable only when you want to construct a new building. Its application applies generally to all types of buildings such as residential houses, restaurants, shop houses, or office buildings.

This is different with PBG. The latest PBG regulation does not require you to apply for permission before starting construction. However, the regulation requires compliance with safety aspects and building functions.

2. Report Content

When applying for an IMB from the government, you only need to submit a simple report. In it, you only need to state the function of the building to be constructed.

The situation is different when applying for PBG. The government not only requires a report on the building’s function. At the same time, you also need to submit proof of the building’s compliance with spatial planning regulations.

3. Requirements and Procedures

Finally, you will encounter differences related to the requirements and procedures for obtaining IMB and PBG. The issuance of IMB focuses mainly on the ownership status of the land or building. If ownership status is clear, then you can obtain an IMB.

However, you won’t find this when processing a PBG. You not only need to meet ownership requirements. At the same time, the government will also require additional compliance regarding the building’s function and spatial planning requirements for its location.

These requirements aim to ensure that the building is of good quality and structurally sound. This way, the building minimizes damage risks and can last for decades. As a result, the building becomes a safe and comfortable place for its occupants.

That’s the explanation about the latest PBG regulation and how it differs from IMB. Got it? For the application process, you do need to prepare more documents. So, it’s no wonder if you feel confused when trying to handle the process yourself.

The good news is, Elmar now offers services to assist with various types of business permits, including PBG. With Elmar’s services, you can focus more on developing strategies to ensure your business runs effectively and smoothly.

Latest PBG Regulation as a Replacement for IMB, Know the Difference! Read More »